PG&E Residential EV Charging rebate (Rebate Plus, income-qualified)
Up to $2,000 for installation of an eligible EV charger; Up to $5,000 for a panel upgrade and installation of an eligible EV charger
Up to $5,000 in rebates from 2 programs. 16 licensed installers based in Arcata.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($5,000), a typical job could cost you as little as $0.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Up to $2,000 for installation of an eligible EV charger; Up to $5,000 for a panel upgrade and installation of an eligible EV charger
Up to $2,000 toward buying and installing a Level 2 home charger. The alternative is a $2,000 prepaid card for public charging; you get one or the other. It comes with a DCAP vehicle grant: up to $7,500 with no...
Loading map…
17 public charging stations in Arcata: 28 Level 2 ports and 14 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Arcata, CA - Tesla Supercharger | 5000 West Valley Boulevard | 12 fast | Tesla | 24 hours daily. NACS partner enabled. |
| GF4EVA ARCATA DC1 | 601 8th St | 1 fast | ChargePoint Network | 24 hours daily |
| GF4EVA ARCATA DC2 | 601 8th St | 1 fast | ChargePoint Network | 24 hours daily |
| GF4EVA ARCATA L2 | 601 8th St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HSU G12-1 ADA | 1 Harpst St. | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HSU G12-2 | 1 Harpst St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HSU G12-3 | 1 Harpst St. | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HSU G12-5 | 1 Harpst St. | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RCEA EV NETWORK ARCATA COMM 1 | 321 Dr. M.L.K. Jr Pkwy | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RCEA EV NETWORK ARCATA COMM 2 | 321 Dr. M.L.K. Jr Pkwy | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RCEA EV NETWORK ARCATA COMM 3 | 321 Dr. M.L.K. Jr Pkwy | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RCEA EV NETWORK ARCATA COMM 4 | 321 Dr. M.L.K. Jr Pkwy | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RCEA EV NETWORK ATC | 1385 8th St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RCEA EV NETWORK CARLSON PARK 1 | 5285 Carlson Park Drive | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RCEA EV NETWORK CARLSON PARK 2 | 5285 Carlson Park Drive | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RCEA EV NETWORK MAD RIVER HSP 1 | 3800 Janes Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RCEA EV NETWORK MAD RIVER HSP 2 | 3800 Janes Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.