PG&E Residential EV Charging rebate (Rebate Plus, income-qualified)
Up to $2,000 for installation of an eligible EV charger; Up to $5,000 for a panel upgrade and installation of an eligible EV charger
Up to $5,000 in rebates from 3 programs. 49 licensed installers based in Martinez.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($5,000), a typical job could cost you as little as $0.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Up to $2,000 for installation of an eligible EV charger; Up to $5,000 for a panel upgrade and installation of an eligible EV charger
Up to $2,000 toward buying and installing a Level 2 home charger. The alternative is a $2,000 prepaid card for public charging; you get one or the other. It comes with a DCAP vehicle grant: up to $7,500 with no...
$50 one-time bonus for enrolling and charging, plus $10 per month for charging during low-carbon events
Loading map…
36 public charging stations in Martinez: 43 Level 2 ports and 22 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Martinez, CA - Tesla Supercharger | 520 Center Avenue | 16 fast | Tesla | 24 hours daily. NACS partner enabled. |
| Albertsons-Safeway 0939 (Martinez, CA) | 3334 Alhambra Ave | 4 fast | Electrify America | 24 hours daily |
| Lucky | 1145 Arnold Dr | 2 fast | eVgo Network | 24 hours daily |
| 4CD DO | 500 Court St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CONTRA COSTA CO SPACE 12-13 | 1215 Escobar St (651 Pine St) | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CONTRA COSTA CO SPACE 3-4 | 1126 Escobar St (651 Pine St) | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CONTRA COSTA CO SPACE 6-7 | 1126 Escobar St (651 Pine St) | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CONTRA COSTA CO SPACE 9-10 | 1126 Escobar St (651 Pine St) | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CONTRA COSTA CO THIRTEEN | 1122 Escobar St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MARTINEZ CA CITY HALL 01 | 525 Henrietta St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MARTINEZ CA CITY HALL 02 | 525 Henrietta St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MARTINEZ CA MTZ AMTRAK #1 | 407 Estudillo St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| STATION 1 IBEW LU 302 | 1875 Arnold Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CONTRA COSTA CO 255 GLACIER 1 | 225 Glacier Dr | 1 Level 2 | ChargePoint Network | 24 hours daily |
| CONTRA COSTA CO 255 GLACIER 2 | 225 Glacier Dr | 1 Level 2 | ChargePoint Network | 24 hours daily |
| CONTRA COSTA CO EIGHT | 1126 Escobar St | 1 Level 2 | ChargePoint Network | 24 hours daily |
| CONTRA COSTA CO ELEVEN | 1126 Escobar St | 1 Level 2 | ChargePoint Network | 24 hours daily |
| CONTRA COSTA CO EOC - PUBLIC 1 | 1850 Muir Rd | 1 Level 2 | ChargePoint Network | 24 hours daily |
| CONTRA COSTA CO EOC - PUBLIC 2 | 1850 Muir Rd | 1 Level 2 | ChargePoint Network | 24 hours daily |
| CONTRA COSTA CO FIVE | 1126 Escobar St | 1 Level 2 | ChargePoint Network | 24 hours daily |
| CONTRA COSTA CO FOUR | 651 Pine St | 1 Level 2 | ChargePoint Network | 24 hours daily |
| CONTRA COSTA CO NINE | 651 Pine St | 1 Level 2 | ChargePoint Network | 24 hours daily |
| CONTRA COSTA CO ONE | 651 Pine St | 1 Level 2 | ChargePoint Network | 24 hours daily |
| CONTRA COSTA CO SEVEN | 1026 Escobar Street | 1 Level 2 | ChargePoint Network | 24 hours daily |
| CONTRA COSTA CO SIX | 1126 Escobar St | 1 Level 2 | ChargePoint Network | 24 hours daily |
Showing 25 of 36.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.