EV charger installers in Montclair, CA

Up to $4,200 in rebates from 2 programs. 29 licensed installers based in Montclair.

What it really costs in Montclair

A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($4,200), a typical job could cost you as little as $0.

Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.

EV charger rebates in Montclair

Driving Clean Assistance Program (DCAP) - home charger incentive

Up to $2,000 toward buying and installing a Level 2 home charger. The alternative is a $2,000 prepaid card for public charging; you get one or the other. It comes with a DCAP vehicle grant: up to $7,500 with no...

Open California Air Resources Board (statewide; home charger... Checked 2026-10-11
Up to$2,000

EV charger installers

Show all 29 installers

Public EV charging in Montclair

Loading map…

7 public charging stations in Montclair: 13 Level 2 ports and 5 DC fast ports.

StationAddressPortsNetworkHours
Montclair East Shopping Center5467 Moreno St4 fasteVgo Network24 hours daily
Metro Nissan of Montclair9440 Autoplex Dr1 fast, 1 Level 2Non-NetworkedDealership business hours
The Pines Apartments9550 Fremont Ave6 Level 2LOOP24 hours daily
METRO HONDA CT40209399 Autoplex St2 Level 2ChargePoint Network24 hours daily
MONTCLAIR CITY HALL5111 Benito St2 Level 2ChargePoint Network24 hours daily
ALEXAN KENDRY STATION 24825 Cypress St1 Level 2ChargePoint Network24 hours daily
XIAMEN_STATION10588 Monte Vista Ave1 Level 2Non-Networked24 hours daily; for employee use only

Source: U.S. Department of Energy station locator. Confirmation dates vary by station.