EV charger installers in Stinson Beach, CA

Up to $5,000 in rebates from 3 programs. 1 licensed installer based in Stinson Beach.

What it really costs in Stinson Beach

A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($5,000), a typical job could cost you as little as $0.

Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.

EV charger rebates in Stinson Beach

Driving Clean Assistance Program (DCAP) - home charger incentive

Up to $2,000 toward buying and installing a Level 2 home charger. The alternative is a $2,000 prepaid card for public charging; you get one or the other. It comes with a DCAP vehicle grant: up to $7,500 with no...

Open California Air Resources Board (statewide; home charger... Checked 2026-10-11
Up to$2,000

MCE Sync smart EV charging rewards

$50 one-time bonus for enrolling and charging, plus $10 per month for charging during low-carbon events

Open MCE (Marin Clean Energy) Checked 2026-10-11
Up to$50

EV charger installers

Boyce Electric INC

Stinson Beach, 94970
50
Home batteryEV chargerStandby generator
C-10 Electrical 849510 Licensed since 2004

Public EV charging in Stinson Beach

Loading map…

3 public charging stations in Stinson Beach: 12 Level 2 ports.

StationAddressPortsNetworkHours
Golden Gate National Recreation Area - Stinson Beach4900 Shoreline Highway 14 Level 2Non-NetworkedPark hours; 4 hour limit
Golden Gate National Recreation Area – Stinson Beach10 Marine Way4 Level 2RIVIAN_WAYPOINTS24 hours daily
PWRO: GOGA Public Electric Vehicle Chargers - CLStinson Beach Central Lot4 Level 2Non-NetworkedContact station for availability

Source: U.S. Department of Energy station locator. Confirmation dates vary by station.