PG&E Residential EV Charging rebate (Rebate Plus, income-qualified)
Up to $2,000 for installation of an eligible EV charger; Up to $5,000 for a panel upgrade and installation of an eligible EV charger
Up to $5,000 in rebates from 3 programs. 1 licensed installer based in Stinson Beach.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($5,000), a typical job could cost you as little as $0.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Up to $2,000 for installation of an eligible EV charger; Up to $5,000 for a panel upgrade and installation of an eligible EV charger
Up to $2,000 toward buying and installing a Level 2 home charger. The alternative is a $2,000 prepaid card for public charging; you get one or the other. It comes with a DCAP vehicle grant: up to $7,500 with no...
$50 one-time bonus for enrolling and charging, plus $10 per month for charging during low-carbon events
Loading map…
3 public charging stations in Stinson Beach: 12 Level 2 ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Golden Gate National Recreation Area - Stinson Beach | 4900 Shoreline Highway 1 | 4 Level 2 | Non-Networked | Park hours; 4 hour limit |
| Golden Gate National Recreation Area – Stinson Beach | 10 Marine Way | 4 Level 2 | RIVIAN_WAYPOINTS | 24 hours daily |
| PWRO: GOGA Public Electric Vehicle Chargers - CL | Stinson Beach Central Lot | 4 Level 2 | Non-Networked | Contact station for availability |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.