EV charger installers in Sutter Creek, CA

Up to $5,000 in rebates from 2 programs. 6 licensed installers based in Sutter Creek.

What it really costs in Sutter Creek

A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($5,000), a typical job could cost you as little as $0.

Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.

EV charger rebates in Sutter Creek

Driving Clean Assistance Program (DCAP) - home charger incentive

Up to $2,000 toward buying and installing a Level 2 home charger. The alternative is a $2,000 prepaid card for public charging; you get one or the other. It comes with a DCAP vehicle grant: up to $7,500 with no...

Open California Air Resources Board (statewide; home charger... Checked 2026-10-11
Up to$2,000

EV charger installers

Public EV charging in Sutter Creek

Loading map…

3 public charging stations in Sutter Creek: 5 Level 2 ports.

StationAddressPortsNetworkHours
Hanford House Inn - Tesla Destination61 Hanford St2 Level 2Tesla Destination24 hours daily. Open to Teslas only.
STATION GOLD QUARTZ 135 Bryson Dr2 Level 2ChargePoint Network24 hours daily
Amador Transit115 Valley View Way1 Level 2Non-Networked24 hours daily; pay lot

Source: U.S. Department of Energy station locator. Confirmation dates vary by station.