SCE Charge Ready Home Installation Rebate (panel and 240 V circuit for EV charging)
Up to $4,200 for Electrical Panel Upgrade and EV Outlet Installation; Up to $1,000 for EV Outlet-Only Installation
Up to $4,200 in rebates from 2 programs. 4 licensed installers based in Woodlake.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($4,200), a typical job could cost you as little as $0.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Up to $4,200 for Electrical Panel Upgrade and EV Outlet Installation; Up to $1,000 for EV Outlet-Only Installation
Up to $2,000 toward buying and installing a Level 2 home charger. The alternative is a $2,000 prepaid card for public charging; you get one or the other. It comes with a DCAP vehicle grant: up to $7,500 with no...
Loading map…
5 public charging stations in Woodlake: 8 Level 2 ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| CITY HALL STATION1 | 350 North Valencia Boulevard | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CITY HALL STATION2 | 350 North Valencia Boulevard | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CITY HALL STATION3 | 350 North Valencia Boulevard | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CITY HALL STATION4 | 350 North Valencia Boulevard | 1 Level 2 | ChargePoint Network | 24 hours daily |
| CITY HALL STATION5 | 350 North Valencia Boulevard | 1 Level 2 | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.