EV charger installers in Ault, CO

7 licensed installers based in Ault.

What it really costs in Ault

A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.

Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.

EV charger rebates in Ault

We haven't found a program specific to this area yet. Statewide programs are on the state page.

EV charger installers

Miracle Electric

Ault, 80610
50
Home batteryEV chargerStandby generator
Electrical Contractor 5978 Licensed since 2002
Contact through our quote form
Is this your business? Claim it free

North Shore Electric and Marine LLC

Ault, 80610
50
Home batteryEV chargerStandby generator
Electrical Contractor 6345 Licensed since 2003
Contact through our quote form
Is this your business? Claim it free

Roberts' Electrical Services LLC

Ault, 80610
50
Home batteryEV chargerStandby generator
Electrical Contractor 100589 Licensed since 2015
Contact through our quote form
Is this your business? Claim it free