EV charger installers in Dacono, CO

1 rebate program available. 2 licensed installers based in Dacono.

What it really costs in Dacono

A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.

Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.

EV charger rebates in Dacono

United Power - member rebates

Rebates for EV chargers, heat pumps and other efficient equipment; amounts on the rebates page.

Check status United Power Not yet confirmed

EV charger installers

Public EV charging in Dacono

Loading map…

3 public charging stations in Dacono: 0 Level 2 ports and 6 DC fast ports.

StationAddressPortsNetworkHours
Interstate Ford120 Laura Court4 fastFORD_CHARGE24 hours daily
MAVERIK DACONO PL1127 Laura Way1 fastChargePoint Network24 hours daily
MAVERIK DACONO PL2127 Laura Way1 fastChargePoint Network24 hours daily

Source: U.S. Department of Energy station locator. Confirmation dates vary by station.