EV charger installers in Dillon, CO
9 licensed installers based in Dillon.
What it really costs in Dillon
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in Dillon
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
Apex Electric
Dillon, 80435Ascent Electric
Dillon, 80435Avalanche Electric Services Corp.
Dillon, 80435Larry Pruss Company
Dillon, 80435Sweet Electric, Inc.
Dillon, 80435Wofford Electric
Dillon, 80435High Rockies Electric LLC
Keystone, 80435Sequence Contracting LLC
Dillon, 80435Public EV charging in Dillon
Loading map…
14 public charging stations in Dillon: 24 Level 2 ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| ARAPAHOE BASIN STATION 1 | 28194 US-6 | 2 Level 2 | ChargePoint Network | Mon: 6:00am-10:00pm; Tue: 6:00am-10:00pm; Wed: 6:00am-10:00pm; Thu: 6:00am-10:00pm; Fri: 6:00am-10:00pm; Sat: 6:00am-10:00pm; Sun: 6:00am-10:00pm |
| ARAPAHOE BASIN STATION 2 | 28194 US-6 | 2 Level 2 | ChargePoint Network | Mon: 6:00am-10:00pm; Tue: 6:00am-10:00pm; Wed: 6:00am-10:00pm; Thu: 6:00am-10:00pm; Fri: 6:00am-10:00pm; Sat: 6:00am-10:00pm; Sun: 6:00am-10:00pm |
| ARAPAHOE BASIN STATION 3 | 28194 US-6 | 2 Level 2 | ChargePoint Network | Mon: 6:00am-10:00pm; Tue: 6:00am-10:00pm; Wed: 6:00am-10:00pm; Thu: 6:00am-10:00pm; Fri: 6:00am-10:00pm; Sat: 6:00am-10:00pm; Sun: 6:00am-10:00pm |
| ARAPAHOE BASIN STATION 4 | 28194 US-6 | 2 Level 2 | ChargePoint Network | Mon: 6:00am-10:00pm; Tue: 6:00am-10:00pm; Wed: 6:00am-10:00pm; Thu: 6:00am-10:00pm; Fri: 6:00am-10:00pm; Sat: 6:00am-10:00pm; Sun: 6:00am-10:00pm |
| ARAPAHOE BASIN STATION 5 | 28194 US-6 | 2 Level 2 | ChargePoint Network | Mon: 6:00am-10:00pm; Tue: 6:00am-10:00pm; Wed: 6:00am-10:00pm; Thu: 6:00am-10:00pm; Fri: 6:00am-10:00pm; Sat: 6:00am-10:00pm; Sun: 6:00am-10:00pm |
| CHARGE_PT STATION1 | 100 Dercum Square | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CHARGE_PT STATION2 | 100 Dercum Square | 2 Level 2 | ChargePoint Network | 24 hours daily |
| COMNTCO DILLON | 325 Fiedler Avenue | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HRL EV GARAGE HRL EV STATIONS | 22714 US-6 | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Homewood Suites by Hilton (Dillon, CO) | 122 Lake Dillon Dr | 2 Level 2 | TURNONGREEN | |
| TENDERFOOT EV PS A | 22784 U.S. 6 | 1 Level 2 | ChargePoint Network | 24 hours daily |
| TENDERFOOT EV PS B | 22784 U.S. 6 | 1 Level 2 | ChargePoint Network | 24 hours daily |
| TENDERFOOT EV PS C | 22784 U.S. 6 | 1 Level 2 | ChargePoint Network | 24 hours daily |
| TENDERFOOT EV PS D | 22784 U.S. 6 | 1 Level 2 | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.