EV charger installers in La Junta, CO
7 licensed installers based in La Junta.
What it really costs in La Junta
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in La Junta
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
JLH Electrical, LLC
La Junta, 81050Malden's Electric
La Junta, 81050Miell Electric
La Junta, 81050Eric's Electric of La Junta LLC
La Junta, 81050Nelson Electrical Services
La Junta, 81050SECO Plumbing & Home Repairs
La Junta, 81050Public EV charging in La Junta
Loading map…
6 public charging stations in La Junta: 10 Level 2 ports and 3 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| PERKINS CHEVROLET GMC | 22 EAST FIRST STREET | 1 fast, 4 Level 2 | EV Connect | 24 hours daily |
| HION NETWORK LA JUNTA DC1 | 5 Walmart Way | 1 fast | ChargePoint Network | 24 hours daily |
| HION NETWORK LA JUNTA DC2 | 5 Walmart Way | 1 fast | ChargePoint Network | 24 hours daily |
| OTERO COLLEGE OTERO #1 | 55 Piñon St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| OTERO COLLEGE OTERO #2 | 55 Piñon St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SECPA MAIN OFFICE | 27850 Harris Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.