Connecticut EV Charging Program - residential Level 2 charger and wiring upgrade rebate (Eversource / UI)
up to $1,500
Up to $1,500 in rebates from 2 programs. 75 licensed installers based in Bristol.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($1,500), a typical job could cost you as little as $400.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
up to $1,500
$100 one-time enrollment incentive; ongoing up to $120/year (Baseline tier) or up to $300/year (Advanced tier)
Loading map…
62 public charging stations in Bristol: 136 Level 2 ports and 18 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Terryville Avenue Valero | 50 Terryville Ave | 4 fast | RED_E | |
| Crowley Nissan | 1451 Farmington Ave | 2 fast, 2 Level 2 | ChargePoint Network | Dealership business hours |
| CHRYSLER 1461 CJDR L3-A | 1461 Farmington Avenue | 1 fast | ChargePoint Network | 24 hours daily |
| CHRYSLER 238 238 LEVEL 3 - A | 238 Broad St | 1 fast | ChargePoint Network | 24 hours daily |
| CHRYSLER 238 23B LEVEL 3 - B | 238 Broad St | 1 fast | ChargePoint Network | 24 hours daily |
| CROWLEY KIA KIA LEVEL 3-A | 223 Broad St | 1 fast | ChargePoint Network | 24 hours daily |
| CROWLEY KIA KIA LEVEL 3-B | 223 Broad St | 1 fast | ChargePoint Network | 24 hours daily |
| CROWLEY KIA KIA LEVEL 3-C | 223 Broad Street | 1 fast | ChargePoint Network | 24 hours daily |
| CROWLEY KIA KIA LEVEL 3-D | 223 Broad St | 1 fast | ChargePoint Network | 24 hours daily |
| CROWLEY NISSAN NISSAN L3-A | 1451 Farmington Ave | 1 fast | ChargePoint Network | 24 hours daily |
| CROWLEY NISSAN NISSAN L3-B | 1451 Farmington Avenue | 1 fast | ChargePoint Network | 24 hours daily |
| Crowley Nissan | 1451 Farmington Ave | 1 fast | IN_CHARGE | Dealership business hours |
| STEPHEN CAD SHOWROOM 62.5KW | 1097 Farmington Ave | 1 fast | ChargePoint Network | 24 hours daily |
| STEPHEN CAD SVC PDI2 62.5KW | 1097 Farmington Ave | 1 fast | ChargePoint Network | 24 hours daily |
| 1251 Farmington Ave | 1251 Farmington Ave | 24 Level 2 | LOOP | 24 hours daily |
| Bristol Events Center | 42 Century Dr | 16 Level 2 | FLASH | 24 hours daily |
| 1019 Farmington | 1019 Farmington Ave | 4 Level 2 | LOOP | 24 hours daily |
| 415 North Main Street | 415 N Main St | 4 Level 2 | Non-Networked | 24 hours daily |
| 431 North Main Street | 431 N Main St | 4 Level 2 | Non-Networked | 24 hours daily |
| 7 Conlon Street, Bristol, CT | 7 Conlon St | 4 Level 2 | Non-Networked | 24 hours daily |
| 425 North Main Street | 425 N Main St | 3 Level 2 | Non-Networked | 24 hours daily |
| 10 Pine Brook Terrace | 10 Pine Brook Terrace | 2 Level 2 | Non-Networked | 24 hours daily |
| 40 Pine Brook Terrace | 40 Pine Brook Terrace | 2 Level 2 | Non-Networked | 24 hours daily |
| 60 Pine Brook Terrace | 60 Pine Brook Terrace | 2 Level 2 | Non-Networked | 24 hours daily |
| 65 Pine Brook Terrace | 65 Pine Brook Terrace | 2 Level 2 | Non-Networked | 24 hours daily |
Showing 25 of 62.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.