Connecticut EV Charging Program - residential Level 2 charger and wiring upgrade rebate (Eversource / UI)
up to $1,500
Up to $1,500 in rebates from 2 programs. 8 licensed installers based in Storrs Mansfield.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($1,500), a typical job could cost you as little as $400.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
up to $1,500
$100 one-time enrollment incentive; ongoing up to $120/year (Baseline tier) or up to $300/year (Advanced tier)
Loading map…
61 public charging stations in Storrs Mansfield: 143 Level 2 ports and 1 DC fast port.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| UCONN STORRS G LOT DC | 25 Diane Wright Way Gampel | 1 fast | ChargePoint Network | 24 hours daily |
| University of Connecticut - Innovation Partnership Building | 159 Discovery Dr | 8 Level 2 | Non-Networked | 24 hours daily |
| UConn - Science 1 Building | 25 King Hill Rd | 6 Level 2 | Non-Networked | 24 hours daily |
| University of Connecticut - Lot G | 25 LeDoyt Rd | 6 Level 2 | Non-Networked | 24 hours daily |
| Mansfield Parking Garage | 9 Dog Ln | 4 Level 2 | Non-Networked | Garage business hours |
| Mansfield Public Library | 54 Warrenville Rd | 4 Level 2 | SWTCH | 24 hours daily |
| SWTCH Energy Inc. | 10 S Eagleville Rd | 4 Level 2 | SWTCH | 24 hours daily |
| SWTCH Energy Inc. | 4 S Eagleville Rd | 4 Level 2 | SWTCH | 24 hours daily |
| Storrs Parking Garage | 33 Royce Circle | 4 Level 2 | FLASH | 24 hours daily |
| Swtch Energy | 10 S Eagleville Rd | 4 Level 2 | SWTCH | 24 hours daily |
| Swtch Energy | 303 Maple Rd | 4 Level 2 | SWTCH | 24 hours daily |
| Swtch Energy | 4 S Eagleville Rd | 4 Level 2 | SWTCH | 24 hours daily |
| University of Connecticut - North Parking Garage | 2152 Hillside Rd | 4 Level 2 | Non-Networked | Garage business hours |
| University of Connecticut - South Parking Garage | 2366 Jim Calhoun Way | 4 Level 2 | Non-Networked | Garage business hours; Drivers must bring their own J1772 cordset for Level 1 charging |
| University of Connecticut | 3 Discovery Dr | 3 Level 2 | Non-Networked | Contact station for hours of availability. |
| ENG-000041 | 1498 Stafford Rd | 2 Level 2 | WEVO | 24 hours daily |
| SWTCH Energy Inc. | 450 S Eagleville Rd | 2 Level 2 | SWTCH | 24 hours daily |
| SWTCH Energy Inc. | 50 Depot Rd | 2 Level 2 | SWTCH | 24 hours daily |
| Spring Hill Inn | 957 Storrs Rd | 2 Level 2 | EVGATEWAY | 24 hours daily |
| Swtch Energy | 450 S Eagleville Rd | 2 Level 2 | SWTCH | 24 hours daily |
| Swtch Energy | 50 Depot Rd | 2 Level 2 | SWTCH | 24 hours daily |
| UCONN STORRS DAIRY 1 | 17 Manter Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| UCONN STORRS DAIRY 2 | 17 Manter Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| UCONN STORRS GAMPEL 1 | 2111 Hillside Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| UCONN STORRS GAMPEL 2 | 2111 hillside rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
Showing 25 of 61.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.