A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.).
With the biggest rebate on offer here ($360), a typical job could cost you as little as $1,540.
Monthly bill credits for letting Tampa Electric briefly pause enrolled equipment at peak times. Older brochure: Level 2 EV charger $9/month ($108/yr), water heater $6/month, all four equipment types $30/month; a 2026...
One-time credit toward new outlets, wiring and other electrical upgrades needed for a Level 2 (or higher) home charger; does not cover the charger hardware, software or permit fees. The Florida cap was not confirmed...
$7.50 monthly bill credit for charging an EV during off-peak hours with a Level 2 charger (an older article cited $10/month for a pilot). Charging-behavior credit, not a charger purchase rebate.
OpenDuke Energy FloridaNot yet confirmed
EV charger installers
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.
Public EV charging in Bradley
Loading map…
1 public charging station in Bradley: 4 Level 2 ports.
Station
Address
Ports
Network
Hours
Polk Power Plant
9995 FL-37
4 Level 2
CHARGEUP
24 hours daily
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.