Eversource Massachusetts - home EV charger rebate
Rebate toward a qualifying Level 2 home charger and wiring when you enroll in off-peak charging.
1 rebate program available. 0 licensed installers based in Amherst.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Rebate toward a qualifying Level 2 home charger and wiring when you enroll in off-peak charging.
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.
Loading map…
53 public charging stations in Amherst: 109 Level 2 ports and 2 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| AMHERST PUBLIC LOT 1 | North Prospect Street | 1 fast | ChargePoint Network | 24 hours daily |
| AMHERST PUBLIC LOT 2 | North Prospect Street | 1 fast | ChargePoint Network | 24 hours daily |
| SWTCH Energy Inc. | 30 Boltwood Ave | 10 Level 2 | SWTCH | 24 hours daily |
| SWTCH Energy | 30 Boltwood Ave | 3 Level 2 | SWTCH | 24 hours daily; for guest use only |
| AEG 1AR20 | 20 Amherst Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| AEG 1AR22 | 22 Amherst Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| AEG 2AR20 | 20 Amherst Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| AEG 2AR22 | 22 Amherst Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| AEG 3AR20 | 20 Amherst Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| AEG 3AR22 | 22 Amherst Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| AEG 4AR22 | 22 Amherst Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| AMHERST AM. HOUSING 1 | 53 Kellogg Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| AMHERST BOLTWOOD LL1 | Boltwood Place | 2 Level 2 | ChargePoint Network | 24 hours daily |
| AMHERST BOLTWOOD LL2 | 41 Boltwood Walk | 2 Level 2 | ChargePoint Network | 24 hours daily |
| AMHERST BOLTWOOD UL 1 | 51 Boltwood Walk | 2 Level 2 | ChargePoint Network | 24 hours daily |
| AMHERST MIDDLE SCHOOL | 170 Chestnut St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| AMHERST OFF PK AOP NORTH SIDE | 417 West St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| AMHERST OFF PK AOP SOUTH | 417 West St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| AMHERST PRAY STREET 1 | 27 Pray St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| AMHERST TOWN HALL LOT | 4 Boltwood Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SEVENTY STATION 1 | 70 University Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| THE BEACON COMM NORTH SQUARE | 85 Cowls Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| UMASS AMHERST LOT 22 L19 | 23 North University Drive lot 22 | 2 Level 2 | ChargePoint Network | 24 hours daily |
| UMASS AMHERST LOT 22 L20 | 39 N University Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| UMASS AMHERST LOT 22 L21 | 23 N University Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
Showing 25 of 53.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.