National Grid Massachusetts - home EV charging program
Rebate toward a Level 2 home charger and installation with off-peak charging enrollment.
1 rebate program available. 0 licensed installers based in Andover.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Rebate toward a Level 2 home charger and installation with off-peak charging enrollment.
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.
Loading map…
27 public charging stations in Andover: 59 Level 2 ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| West Elementary School | 58 Beacon Street | 6 Level 2 | Blink Network | 24 hours daily |
| Green Bridge EV Charging - 160 Dascomb | 160 Dascomb Rd | 4 Level 2 | GREEN_BRIDGE | 24 hours daily |
| 18 NEBC CHARGE STATION 01 | 18 New England Business Center Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 200 BOP BACK 2 | 300 Brickstone Square | 2 Level 2 | ChargePoint Network | 24 hours daily |
| ANDOVER SCHOOLS ANDOVER HS-EV1 | 80 Shawsheen Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| GR. LAWRENCE GRL 1 | 57 River Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| GR. LAWRENCE GRL 2 | 57 River Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| GR. LAWRENCE GRL 3 | 57 River Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| GR. LAWRENCE GRL 4 | 57 River Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| GR. LAWRENCE GRL 5 | 57 River Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| GR. LAWRENCE GRL6 | 43 River Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| PHILLIPSACADEMY 18 OLD CAMPUS 1 | 18 Old Campus Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| PHILLIPSACADEMY 3 PHILLIPS 2 | 3 Phillips Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| PHILLIPSACADEMY 3PHILLIPS 1 | 3 Phillips Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| PHILLIPSACADEMY ANDOVER INN | 1 Chapel Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| PHILLIPSACADEMY PAN ATHLETIC 1 | Dwight St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| PHILLIPSACADEMY SYNDER ATHLETIC | Field House Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| South Church Parking Lot | 41 Central St | 2 Level 2 | CHARGELAB | |
| TOWN OF ANDOVER MAIN ST-EV001 | Andover Center | 2 Level 2 | ChargePoint Network | 24 hours daily |
| TOWN OF ANDOVER MUNICIPAL LOT 3 | 2 Bartlet St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| VICORCORP FEDERAL-001 | 400 Federal Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| VICORCORP FEDERAL-002 | 400 Federal Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| VICORCORP FEDERAL-003 | 400 Federal Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| VICORCORP STATION 1 | 25 Frontage Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| VICORCORP STATION 2 | 25 Frontage Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
Showing 25 of 27.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.