Eversource Massachusetts - home EV charger rebate
Rebate toward a qualifying Level 2 home charger and wiring when you enroll in off-peak charging.
1 rebate program available. 0 licensed installers based in Barnstable.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Rebate toward a qualifying Level 2 home charger and wiring when you enroll in off-peak charging.
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.
Loading map…
30 public charging stations in Barnstable: 48 Level 2 ports and 10 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| MASSDOT BARN EXP #2 | 2145 Iyannough Road | 2 fast | ChargePoint Network | 24 hours daily |
| MASSDOT EXP #1 | 2145 Iyannough Road | 2 fast | ChargePoint Network | 24 hours daily |
| PCCJEEP PL-1-L | 556 Yarmouth Rd | 2 fast | ChargePoint Network | 24 hours daily |
| PCCJEEP PL-3-R | 556 Yarmouth Rd | 2 fast | ChargePoint Network | 24 hours daily |
| MASSDOT BARNSTABLE PR#1 | 2155 Iyannough Rd | 1 fast | ChargePoint Network | 24 hours daily |
| MASSDOT BARNSTABLE PR#2 | 2155 Iyannough Road | 1 fast | ChargePoint Network | 24 hours daily |
| AMPCAP 1506 HYANNIS | 65 Independence Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Barnstable High School | 744 W Main St | 2 Level 2 | Non-Networked | 8am-4:30pm daily |
| Barnstable Town Hall | 367 Main St | 2 Level 2 | Non-Networked | 8am-4:30pm daily |
| CCRTA EV-10 TRANSP DR | 18 Center St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CCRTA EV-7 TRANSP DRV | 22 Ridgewood Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CCRTA EV-8 TRANSP DRV | 1 Transportation Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CCRTA EV-9 TRANSP DRV | 68 Center St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| COUNTY COMPLEX DEEDS #1 | 70 Railroad Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| COUNTY COMPLEX INNOVATION 1 | 3195 Main St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| COUNTY COMPLEX INNOVATION 2 | 3195 Main St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| COUNTY COMPLEX RECYCLE SHED | 3195 Main Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HHYANNIS STATION 1 | 99 Wilkens Lane | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HHYANNIS STATION 2 | 99 Wilkens Lane | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HHYANNIS STATION 3 | 99 Wilkens Lane | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HHYANNIS STATION 4 | 99 Wilkens Lane | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HHYANNIS STATION 6 | 99 Wilkens Lane | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HHYANNIS STATION 7 | 99 Wilkens Lane | 2 Level 2 | ChargePoint Network | 24 hours daily |
| IRA TOYOTA HYA FRONT 1 | 1020 Iyannough Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MASS AUDUBON LONG PASTURE #1 | 345 Bone Hill Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
Showing 25 of 30.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.