EV charger installers in Bridgewater, MA

1 rebate program available. 0 licensed installers based in Bridgewater.

What it really costs in Bridgewater

A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.

Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.

EV charger rebates in Bridgewater

EV charger installers

No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.

Public EV charging in Bridgewater

Loading map…

28 public charging stations in Bridgewater: 55 Level 2 ports and 18 DC fast ports.

StationAddressPortsNetworkHours
Valley Storage15 Whitman St East6 fastRED_E
Market Basket West Bridgewater #70352 W Center St West4 fasteVgo Network24 hours daily
Mechanics Co-op Bank Bridgewater72 Main St2 fastAUTEL24 hours daily; for clients only
Mechanics Cooperative Bank Bridgewater72 Main Street2 fastRED_E
MASSDOT NBBRIDGEWATER LFall River Expy1 fastChargePoint Network24 hours daily
MASSDOT NBBRIDGEWATER RFall River Expy1 fastChargePoint Network24 hours daily
MASSDOT SBBRIDGEWATER LMA-241 fastChargePoint Network24 hours daily
MASSDOT SBBRIDGEWATER RRoute 24 Southbound1 fastChargePoint Network24 hours daily
Bridgewater State University Dana Mohler-Faria Science & Mathematics Center24 Park Ave8 Level 2Non-NetworkedUniversity hours
Bridgewater State University Weygand Lot85 Burrill Ave6 Level 2Non-Networked24 hours daily
Bridgewater Town Hall66 Central Square4 Level 2Non-Networked24 hours daily
Mitchell Elementry School500 South Street4 Level 2FLO24 hours daily
Bridgewater State University Great Hill Drive GarageGreat Hill Dr3 Level 2Non-Networked24 hours daily
BSU BSUWEY UNIT 1351 Great Hill Drive2 Level 2ChargePoint Network24 hours daily
BSU BSUWEY UNIT 2351 Great Hill Drive2 Level 2ChargePoint Network24 hours daily
BSU BSUWEY UNIT 3351 Great Hill Drive2 Level 2ChargePoint Network24 hours daily
BSU DMF UNIT 124 Park Avenue2 Level 2ChargePoint Network24 hours daily
BSU DMF UNIT 224 Park Avenue2 Level 2ChargePoint Network24 hours daily
BSU DMF UNIT 324 Park Ave2 Level 2ChargePoint Network24 hours daily
BSU DMF UNIT 424 Park Avenue2 Level 2ChargePoint Network24 hours daily
BSU TINSLEY UNIT 1Tinsley Center2 Level 2ChargePoint Network24 hours daily
Bridgewater Senior Center10 Wally Krueger Way2 Level 2RED_E
Bridgewater State University Tinsley Center325 Plymouth St2 Level 2Non-NetworkedUniversity hours
MCELWAIN SCHOOL STATION # 1250 Main St2 Level 2ChargePoint Network24 hours daily
MCELWAIN SCHOOL STATION # 2250 Main St2 Level 2ChargePoint Network24 hours daily

Showing 25 of 28.

Source: U.S. Department of Energy station locator. Confirmation dates vary by station.