National Grid Massachusetts - home EV charging program
Rebate toward a Level 2 home charger and installation with off-peak charging enrollment.
1 rebate program available. 0 licensed installers based in Franklin.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Rebate toward a Level 2 home charger and installation with off-peak charging enrollment.
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.
Loading map…
17 public charging stations in Franklin: 34 Level 2 ports and 44 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Franklin, MA - Tesla Supercharger | 250 Franklin Village Drive | 12 fast | Tesla | 24 hours daily. NACS partner enabled. |
| Adirondack Club | 800 Chestnut St | 6 fast | RED_E | |
| Franklin Fire Department | 600 King St | 6 fast | RED_E | |
| Franklin Municipal Building | 355 E Central St | 6 fast | RED_E | |
| New England Chapel | 300 East Central Street | 6 fast | RED_E | |
| Vendetti Motors | 411 W Central St | 4 fast | VIALYNK | 24 hours daily |
| Wrentham 5 Dedham | 5 Dedham St | 4 fast | RED_E | |
| Franklin High School | 218 Oak St | 8 Level 2 | AMPUP | Contact site for information |
| Franklin MA DPW Admin | 257 Fisher St | 6 Level 2 | AMPUP | Contact station for hours of availability. |
| Franklin Town Hall | 355 E Central St | 6 Level 2 | AMPUP | Contact station for hours of availability |
| Franklin Public Library | 118 Main St | 3 Level 2 | AMPUP | Contact station for hours of availability. |
| 311EAG STATION 2 | 66 Silver Fox Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| FRANKLIN CONST. BLDV #2 | 101 Constitution Blvd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| FRANKLIN CONST. BLDV #3 | 101 Constitution Blvd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| FRANKLIN CONST. BLVD #1 | 101 Constitution Blvd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Franklin MA DPW | 40 Hayward St | 2 Level 2 | AMPUP | Contact station for hours of availability. |
| 340 East Central Street | 1 Newell Drive | 1 Level 2 | Blink Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.