EV charger installers in New Bedford, MA

1 rebate program available. 1 licensed installer based in New Bedford.

What it really costs in New Bedford

A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.

Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.

EV charger rebates in New Bedford

EV charger installers

Public EV charging in New Bedford

Loading map…

15 public charging stations in New Bedford: 44 Level 2 ports and 2 DC fast ports.

StationAddressPortsNetworkHours
Mechanics Cooperative Bank New Bedford1238 Kempton St2 fastRED_E
St. Luke's Hawthorne St EV168 Hawthorne St10 Level 2AMPUP24 hours daily
MBTA Church Street Station387 Church St8 Level 2Non-Networked24 hours daily
UMass Dartmouth SMAST East Campus836 S Rodney French Blvd6 Level 2Non-Networked24 hours daily
MBTA New Bedford Station532 Acushnet Ave4 Level 2Non-Networked24 hours daily
ASPEN SQUARE CHARGE POINT1399 Phillips Road2 Level 2ChargePoint Network24 hours daily
INTERNATIONAL M PAACA 2360 Coggeshall St2 Level 2ChargePoint Network24 hours daily
MASSDOT NEW BED P&R 11068 Mt Pleasant St2 Level 2ChargePoint Network24 hours daily
MASSDOT NEW BED P&R 21068 Mt Pleasant St2 Level 2ChargePoint Network24 hours daily
MASSDOT NEW BED P&R 31068 Mt Pleasant St2 Level 2ChargePoint Network24 hours daily
MASSDOT NEW BED P&R 41068 Mt Pleasant St2 Level 2ChargePoint Network24 hours daily
INTERNATIONAL M ELM ST GARAGE51 Elm St1 Level 2ChargePoint Network24 hours daily
INTERNATIONAL M ZEITERION #1684 Purchase St1 Level 2ChargePoint Network24 hours daily
INTERNATIONAL M ZEITERION #2684 Purchase St1 Level 2ChargePoint Network24 hours daily
INTERNATIONAL M ZEITERION #3684 Purchase St1 Level 2ChargePoint Network24 hours daily

Source: U.S. Department of Energy station locator. Confirmation dates vary by station.