Eversource Massachusetts - home EV charger rebate
Rebate toward a qualifying Level 2 home charger and wiring when you enroll in off-peak charging.
1 rebate program available. 0 licensed installers based in Waltham.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Rebate toward a qualifying Level 2 home charger and wiring when you enroll in off-peak charging.
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.
Loading map…
83 public charging stations in Waltham: 164 Level 2 ports and 4 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| 26 Seyon Street | 26 Seyon Street | 2 fast, 4 Level 2 | EV Connect | 24 hours daily |
| HION NETWORK WALTHAM BK#1 | 881 Moody Street | 1 fast | ChargePoint Network | 24 hours daily |
| HION NETWORK WALTHAM BK#2 | 881 Moody Street | 1 fast | ChargePoint Network | 24 hours daily |
| 275 2nd Ave | 275 2nd Ave | 4 Level 2 | CHARGELAB | |
| 100 5th Ave | 100 5th Ave | 2 Level 2 | CHARGELAB | |
| 309 WAVERLY 309 WAVERLY | 309 Waverley Oaks Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 500 TOTTEN POND CP010-01 | 480/500 Totten Pond Rd- Boston Properties- 10 | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 500 TOTTEN POND CP010-02 | 480/500 Totten Pond Rd- Boston Properties- 10 | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 500 TOTTEN POND CP010-03 | 480/500 Totten Pond Rd- Boston Properties- 10 | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 500 TOTTEN POND CP010-04 | 500 Totten Pond Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 500 TOTTEN POND CP010-05 | 500 Totten Pond Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 60 SYLVAN 50 SYLVAN 2 | 60 Sylvan Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 60 SYLVAN 50 SYLVAN 3 | 50 Sylvan Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 60 SYLVAN 50 SYLVAN 4 | 50 Sylvan Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 60 SYLVAN 50 SYLVAN 5 | 90 Sylvan Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 60 SYLVAN 50 SYLVAN 6 | 50 Sylvan Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 60 SYLVAN 50 SYLVAN 7 | 90 Sylvan Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 60 SYLVAN 50 SYLVAN 8 | 50 Sylvan Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 60 SYLVAN 50 SYLVAN 9 | 50 Sylvan Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 60 SYLVAN 60 SYLVAN 2 | 90 Sylvan Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 60 SYLVAN 60 SYLVAN 3 | 60 Sylvan Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 60 SYLVAN 60 SYLVAN 4 | 90 Sylvan Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 60 SYLVAN 60 SYLVAN 5 | 60 Sylvan Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 60 SYLVAN 60 SYLVAN 6 | 90 Sylvan Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 60 SYLVAN 60 SYLVAN 8 | 90 Sylvan Rd | 2 Level 2 | ChargePoint Network | 24 hours daily |
Showing 25 of 83.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.