National Grid Massachusetts - home EV charging program
Rebate toward a Level 2 home charger and installation with off-peak charging enrollment.
1 rebate program available. 0 licensed installers based in Weymouth.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Rebate toward a Level 2 home charger and installation with off-peak charging enrollment.
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.
Loading map…
16 public charging stations in Weymouth: 30 Level 2 ports and 8 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Main Street Pizzeria | 380 Washington Street | 6 fast | RED_E | |
| Electric Era Charging Station | 850 Washington Street | 2 fast | ELECTRIC_ERA | 24 hours daily |
| The Point at Weymouth | 39 Trotter Road | 4 Level 2 | Blink Network | 24 hours daily |
| ABIGAIL STATION 1 | 89 Middle St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| ABIGAIL STATION 2 | 92 Middle St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| PRIMARY SCHOOL STATION 1 | 1250 Commercial St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| PRIMARY SCHOOL STATION 2 | 1250 Commercial St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RIDEL CHARGING 60 WINTER 1.1 | 60 Winter St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RIDEL CHARGING 60 WINTER 1.2 | 60 Winter St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RIDEL CHARGING 60 WINTER 1.3 | 60 Winter St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RIDEL CHARGING 60 WINTER 1.4 | 60 Winter St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RIDEL CHARGING 60 WINTER 1.5 | 60 Winter St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RIDEL CHARGING SHAWS 1.2 | 630 Middle Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RIDEL CHARGING SHAWS 1.3 | 630 Middle Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RIDEL CHARGING SHAWS 1.4 | 630 Middle St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RIDEL CHARGING SHAWS 1.5 | 630 Middle St | 2 Level 2 | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.