EV charger installers in Elk River, MN
24 licensed installers based in Elk River.
What it really costs in Elk River
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in Elk River
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
Complete Electrical Solutions INC
Elk River, 55330Custom Electrical Concepts LLC
Elk River, 55330Dj Electric Services INC
Otsego, 55330Elk River Municipal Utilities
Elk River, 55330Excel Electric Services
Elk River, 55330Goodview Electric Company INC
Elk River, 55330Hannay Electric LLC
Elk River, 55330Power Electric Corporation
Elk River, 55330Ready Watt Electric
Elk River, 55330T W Hipsag Electric INC
Elk River, 55330Tradewinds Electric LLC
Elk River, 55330Show all 24 installers
- Vivid Electric LLC (763) 370-8487
- Midwest Electric and Generator LLC (612) 284-1550
- New Century Service (763) 416-2732
- Summit Hill Electric LLC (763) 486-3878
- First Light Electric LLC (763) 234-9541
- Veteran Electric (612) 219-7501
- Sanders Electric, LLC (612) 272-0873
- Local Electric Co (612) 708-6603
- Omega Electric Co (612) 636-7098
- Renegade Electric (763) 760-0423
- Smith Electric (651) 621-9150
- True Phase Electric LLC (443) 675-2693
Public EV charging in Elk River
Loading map…
7 public charging stations in Elk River: 11 Level 2 ports and 6 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Cornerstone Ford - DCFC | 17219 U.S. 10 NW | 4 fast | Blink Network | 24 hours daily |
| SHERBURNE 1 STATION 1 | 13880 Business Center Drive Northwest | 1 fast | ChargePoint Network | 24 hours daily |
| SHERBURNE 1 STATION 2 | 13880 Business Center Drive Northwest | 1 fast | ChargePoint Network | 24 hours daily |
| Cornerstone Ford - Level 2 | 17219 U.S. 10 NW | 5 Level 2 | Blink Network | 24 hours daily |
| ERMU STATIONS STATION 1 | 716 Main Street Nw | 2 Level 2 | ChargePoint Network | 24 hours daily |
| ERMU STATIONS STATION 2 | 13065 Orono Pkwy | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Elk River Utilities | 617 Main St NW | 2 Level 2 | Non-Networked | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.