EV charger installers in Forest Lake, MN
15 licensed installers based in Forest Lake.
What it really costs in Forest Lake
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in Forest Lake
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
Countryview Electric INC
Forest Lake, 55025Davco Technologies INC
Columbus, 55025Electric By Design INC
Forest Lake, 55025Forest Lake Contracting INC
Forest Lake, 55025Palm Electric INC
Forest Lake, 55025Vetters Electric INC
Forest Lake, 55025Langer Electric LLC
Forest Lake, 55025Plugz Electric Co
Forest Lake, 550255k Electric LLC
Forest Lake, 55025Asak Electrical LLC
Forest Lake, 55025Show all 15 installers
- Superior Electric Of Mn LLC (651) 206-5338
- All Day Electric LLC (952) 657-0953
- Powerhouse Electric Service LLC (651) 755-1838
Public EV charging in Forest Lake
Loading map…
5 public charging stations in Forest Lake: 6 Level 2 ports and 9 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Forest Lake Ford | 508 15th St SW | 4 fast, 2 Level 2 | RED_E | |
| Kwik Trip #429 | 4868 208th St N | 4 fast | KWIK_CHARGE | 24 hours daily |
| Whitaker Buick GMC | 131 19th Street SW | 1 fast | EV Connect | 24 hours daily |
| FOREST LAKE SER FOR SVR 1 | 19955 Forest Rd N | 2 Level 2 | ChargePoint Network | 24 hours daily |
| FOREST LAKE SER FOR SVR 2 | 19955 Forest Rd N | 2 Level 2 | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.