Xcel Energy (Minnesota) - EV home charging wiring rebate
Up to $500 toward wiring for a Level 2 home charger; up to $1,300 for income-qualified customers.
Up to $1,300 in rebates from 1 program. 11 licensed installers based in Hopkins.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($1,300), a typical job could cost you as little as $600.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Up to $500 toward wiring for a Level 2 home charger; up to $1,300 for income-qualified customers.
Loading map…
16 public charging stations in Hopkins: 24 Level 2 ports and 14 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Minnetonka, MN - Tesla Supercharger | 13201 Ridgedale Drive | 8 fast | Tesla | 24 hours daily. NACS partner enabled. |
| Morries Minnetonka Ford | 13400 Wayzata Blvd | 4 fast | FORD_CHARGE | Mon: 8:00pm-12:00am; Tue: 12:00am-7:00am, 8:00pm-12:00am; Wed: 12:00am-7:00am, 8:00pm-12:00am; Thu: 12:00am-7:00am, 8:00pm-12:00am; Fri: 12:00am-7:00am, 8:00pm-12:00am; Sat: 12:00am-7:00am, 8:00pm-12:00am; Sun: 12:00am-11:59pm |
| Driskill's - Hopkins | 25 11th Avenue North | 2 fast | ZEFNET | |
| HENNEPIN COUNTY RIDGEDALE RAMP1 | 12601 Ridgedale Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HENNEPIN COUNTY RIDGEDALE RAMP2 | 12601 Ridgedale Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Hopkins Parking Ramp | 26 10th Ave S | 2 Level 2 | Non-Networked | 24 hours daily |
| Larson Capital Management- A | 11055 Wayzata Boulevard | 2 Level 2 | Blink Network | 24 hours daily |
| RIZE OPUS PARK STATION 1 | 10101 Bren Road East | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RIZE OPUS PARK STATION 2 | 10101 Bren Road East | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RIZE OPUS PARK STATION 3 | 10101 Bren Road East | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SEARS IMPORTS CUST PARKING SE | 13500 Wayzata Blvd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SEARS IMPORTS SPRINTER 1 | 13560 Wayzata Blvd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SEARS IMPORTS SPRINTER 2 | 13560 Wayzata Blvd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| The Woodlands of Minnetonka - Tesla Destination | 10275 Greenbrier Rd | 2 Level 2 | Tesla Destination | 24 hours daily. Open to all vehicles. |
| HOPKINS EV HOP RAMP NORTH | 26 11th Ave S | 1 Level 2 | ChargePoint Network | 24 hours daily |
| HOPKINS EV HOP RAMP SOUTH | 26 11th Ave S | 1 Level 2 | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.