PSE&G EV Residential Charging Program - Make-Ready incentive
Up to $1,500 on-bill credit per charger for customer-side wiring; up to $5,000 reduction of any utility-side deposit
Up to $1,500 in rebates from 2 programs. 7 licensed installers based in Bordentown.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($1,500), a typical job could cost you as little as $400.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Up to $1,500 on-bill credit per charger for customer-side wiring; up to $5,000 reduction of any utility-side deposit
Loading map…
7 public charging stations in Bordentown: 30 Level 2 ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Candlewood Suites Bordentown-Trenton, an IHG Hotel - Tesla Destination | 200 Rising sun road | 10 Level 2 | Tesla Destination | 24 hours daily. Open to all vehicles. |
| Hampton Inn Bordentown - Tesla Destination | 2004 Route 206 | 10 Level 2 | Tesla Destination | 24 hours daily. Open to all vehicles. |
| NJDOT BORDENTOWN TC 1 | 389 US-130 | 2 Level 2 | ChargePoint Network | 24 hours daily |
| NJDOT BORDENTOWN TC 2 | 389 US-130 | 2 Level 2 | ChargePoint Network | 24 hours daily |
| NJDOT BORDENTOWN TC 3 | 389 US-130 | 2 Level 2 | ChargePoint Network | 24 hours daily |
| NJDOT BORDENTOWN TC 4 | 389 US-130 | 2 Level 2 | ChargePoint Network | 24 hours daily |
| POINT BREEZE POINT BREEZE | 101 Park St | 2 Level 2 | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.