Rockland Electric New Jersey Charger Ready for Home
50% of make-ready customer sided costs, up to $1000 + 100% of make-ready utility sided costs, up to $5000, capped at 90% of total project cost
Up to $6,000 in rebates from 2 programs. 10 licensed installers based in Hewitt.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($6,000), a typical job could cost you as little as $0.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
50% of make-ready customer sided costs, up to $1000 + 100% of make-ready utility sided costs, up to $5000, capped at 90% of total project cost
Loading map…
2 public charging stations in Hewitt: 4 Level 2 ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| NJDEP STATEPARK WAWAYANDA PS1 | 885 Warwick Turnpike | 2 Level 2 | ChargePoint Network | Mon: 8:00am-7:30pm; Tue: 8:00am-7:30pm; Wed: 8:00am-7:30pm; Thu: 8:00am-7:30pm; Fri: 8:00am-7:30pm; Sat: 8:00am-7:30pm; Sun: 8:00am-7:30pm |
| NJDEP STATEPARK WAWAYANDA PS2 | 885 Warwick Turnpike | 2 Level 2 | ChargePoint Network | Mon: 8:00am-7:30pm; Tue: 8:00am-7:30pm; Wed: 8:00am-7:30pm; Thu: 8:00am-7:30pm; Fri: 8:00am-7:30pm; Sat: 8:00am-7:30pm; Sun: 8:00am-7:30pm |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.