PSE&G EV Residential Charging Program - Make-Ready incentive
Up to $1,500 on-bill credit per charger for customer-side wiring; up to $5,000 reduction of any utility-side deposit
Up to $1,500 in rebates from 2 programs. 24 licensed installers based in Somerset.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($1,500), a typical job could cost you as little as $400.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
Up to $1,500 on-bill credit per charger for customer-side wiring; up to $5,000 reduction of any utility-side deposit
Loading map…
20 public charging stations in Somerset: 40 Level 2 ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Summerfields Lofts - Clubhouse | 100 Rutgers Blvd | 6 Level 2 | FLO | 24 hours daily |
| 1800 Dudley-Summerfields | 1800 Dudley Lane | 2 Level 2 | FLO | 24 hours daily |
| 600 Danbury Summerfields | 600 Danbury Lane | 2 Level 2 | FLO | 24 hours daily |
| Cedar Manor | 1800 Fir Court | 2 Level 2 | FLO | 24 hours daily |
| Cedar Manor - 100 Juniper | 100 Juniper Court | 2 Level 2 | FLO | 24 hours daily |
| FRANKLIN FRANKLIN TWP | 475 Demott Ln | 2 Level 2 | ChargePoint Network | Mon: 7:00am-11:00pm; Tue: 7:00am-11:00pm; Wed: 7:00am-11:00pm; Thu: 7:00am-11:00pm; Fri: 7:00am-11:00pm; Sat: 7:00am-11:00pm; Sun: 7:00am-11:00pm |
| FRANKLIN FRANKLIN TWP 2 | 475 Demott Ln | 2 Level 2 | ChargePoint Network | Mon: 7:00am-11:00pm; Tue: 7:00am-11:00pm; Wed: 7:00am-11:00pm; Thu: 7:00am-11:00pm; Fri: 7:00am-11:00pm; Sat: 7:00am-11:00pm; Sun: 7:00am-11:00pm |
| FRANKLIN FRANKLIN TWP 3 | 475 Demott Ln | 2 Level 2 | ChargePoint Network | Mon: 7:00am-11:00pm; Tue: 7:00am-11:00pm; Wed: 7:00am-11:00pm; Thu: 7:00am-11:00pm; Fri: 7:00am-11:00pm; Sat: 7:00am-11:00pm; Sun: 7:00am-11:00pm |
| FRANKLIN FRANKLIN TWP 4 | 495 Demott Ln | 2 Level 2 | ChargePoint Network | Mon: 7:00am-11:00pm; Tue: 7:00am-11:00pm; Wed: 7:00am-11:00pm; Thu: 7:00am-11:00pm; Fri: 7:00am-11:00pm; Sat: 7:00am-11:00pm; Sun: 7:00am-11:00pm |
| FRANKLIN FRANKLIN TWP 5 | 495 Demott Ln | 2 Level 2 | ChargePoint Network | Mon: 7:00am-11:00pm; Tue: 7:00am-11:00pm; Wed: 7:00am-11:00pm; Thu: 7:00am-11:00pm; Fri: 7:00am-11:00pm; Sat: 7:00am-11:00pm; Sun: 7:00am-11:00pm |
| FRANKLIN INMAN PARK | 299 Leupp Ln | 2 Level 2 | ChargePoint Network | 24 hours daily |
| FRANKLIN MUNICIPAL BLDG | 475 Demott Ln | 2 Level 2 | ChargePoint Network | 24 hours daily |
| FRANKLIN STATION 1 | 429 Lewis St | 2 Level 2 | ChargePoint Network | Mon: 7:00am-11:00pm; Tue: 7:00am-11:00pm; Wed: 7:00am-11:00pm; Thu: 7:00am-11:00pm; Fri: 7:00am-11:00pm; Sat: 7:00am-11:00pm; Sun: 7:00am-11:00pm |
| MCDONALD'S EASTON 01 | 940 Easton Avenue | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Summerfields 360 | 100 Hooper street | 2 Level 2 | FLO | 24 hours daily |
| Summerfields Lofts | 1300 Allen Rd | 2 Level 2 | FLO | 24 hours daily |
| AD SUTTON WHSE EV CHARGER 1 | 55 School Avenue | 1 Level 2 | ChargePoint Network | Mon: 7:00am-8:00am; Tue: 7:00am-8:00am; Wed: 7:00am-8:00am; Thu: 7:00am-8:00am; Fri: 7:00am-8:00am |
| AD SUTTON WHSE EV CHARGER 2 | 55 School Ave | 1 Level 2 | ChargePoint Network | Mon: 7:00am-8:00am; Tue: 7:00am-8:00am; Wed: 7:00am-8:00am; Thu: 7:00am-8:00am; Fri: 7:00am-8:00am |
| AD SUTTON WHSE EV CHARGER 3 | 55 School Ave | 1 Level 2 | ChargePoint Network | Mon: 7:00am-8:00am; Tue: 7:00am-8:00am; Wed: 7:00am-8:00am; Thu: 7:00am-8:00am; Fri: 7:00am-8:00am |
| AD SUTTON WHSE EV CHARGER 4 | 55 School Avenue | 1 Level 2 | ChargePoint Network | Mon: 7:00am-8:00am; Tue: 7:00am-8:00am; Wed: 7:00am-8:00am; Thu: 7:00am-8:00am; Fri: 7:00am-8:00am |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.