EV charger installers in Mechanicville, NY
0 licensed installers based in Mechanicville.
What it really costs in Mechanicville
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in Mechanicville
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.
Public EV charging in Mechanicville
Loading map…
12 public charging stations in Mechanicville: 22 Level 2 ports and 4 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Marchese Ford of Mechanicville | 1003 Hudson River Rd | 4 fast | FORD_CHARGE | 24 hours daily |
| 211 EV STATIONS STATION-1 | 211 North Main Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 211 EV STATIONS STATION-2 | 211 North Main Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 211 EV STATIONS STATION-3 | 211 North Main Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 211 EV STATIONS STATION-4 | 211 North Main Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| 211 EV STATIONS STATION-5 | 211 North Main Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HUDSON HEIGHTS STATION 1 | 700 Broadleaf Path | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HUDSON HEIGHTS STATION 2 | 700 Broadleaf Path | 2 Level 2 | ChargePoint Network | 24 hours daily |
| HUDSON HEIGHTS STATION 3 | 700 Broadleaf Path | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MICHAELSGRP MICHAELS GROUP1 | 1 Marions Way | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MICHAELSGRP MICHAELS GROUP2 | 1 Marion's way | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Mechanicville Public Library | 190 N Main St. | 2 Level 2 | VIALYNK | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.