EV charger installers in Ogdensburg, NY
0 licensed installers based in Ogdensburg.
What it really costs in Ogdensburg
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in Ogdensburg
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.
Public EV charging in Ogdensburg
Loading map…
7 public charging stations in Ogdensburg: 40 Level 2 ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| PT - The Stonefence Resort | 7191 NY-37 | 10 Level 2 | QUICKCHARGE | 24 hours daily; for guest use only |
| Ogdensburg International Airport | 5900 NY-812 | 8 Level 2 | EVGATEWAY | 24 hours daily |
| 8101 NY-68 | 8101 NY-68 | 6 Level 2 | EV Connect | 24 hours daily |
| PT - Inn at GranView | 6765 NY-37 | 6 Level 2 | QUICKCHARGE | 24 hours daily; for guest use only |
| Martin Civic Center | 192 Pine St | 4 Level 2 | ChargePoint Network | 24 hours daily |
| Sherman Inn Ogdensburg | 615 Franklin St | 4 Level 2 | QUICKCHARGE | 24 hours daily; for guest use only |
| NATIONAL GRID 1 BRIDGE PLAZA | 1 Bridge PLaza | 2 Level 2 | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.