EV charger installers in Saranac Lake, NY
0 licensed installers based in Saranac Lake.
What it really costs in Saranac Lake
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in Saranac Lake
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.
Public EV charging in Saranac Lake
Loading map…
15 public charging stations in Saranac Lake: 34 Level 2 ports and 18 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Aldi TUL 46 Saranac Lake | 587 Lake Flower Ave | 8 fast | RED_E | |
| ChargeSmart EV - Saranac Lake | 622 Lake Flower Avenue | 8 fast | CHARGESMART_EV | 24 hours daily |
| Upstate Auto | 469 Broadway | 2 fast, 6 Level 2 | VIALYNK | 24 hours daily |
| Adirondack Health Center | 2233 State Rte 86 | 4 Level 2 | SYNERGEV | 24 hours daily |
| Gauthier's Saranac Lake Inn | 488 Lake Flower Ave | 4 Level 2 | VIALYNK | 24 hours daily |
| FEHBOCES ADK ED CNTR 1 | 711 NY-3 | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Fish Creek Pond Ampitheatre | 4523 NY-30 | 2 Level 2 | Non-Networked | 24 hours daily |
| Fish Creek Pond Campground | 4523 NY-30 | 2 Level 2 | Non-Networked | 24 hours daily |
| HOTSARA CHARGER STATION 1 | 100 Main St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RIVERTRAIL RIVERTRAIL EV1 | 79 Woodruff Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| RIVERTRAIL RIVERTRAIL EV2 | 79 Woodruff Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SWL SARANAC 1.1 | 234 Lake Flower Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SWL SARANAC 1.2 | 234 Lake Flower Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SWL SARANAC 1.3 | 234 Lake Flower Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Saranac Lake - 3 Main St | 3 Main Street | 2 Level 2 | SYNERGEV | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.