ODOT Community Charging Rebates (Round 5) - multifamily Level 2 charging
$8,000 per Level 2 charging port and $80,000 per DC fast charging port, or up to 80-95% of eligible project costs, whichever is lower
Up to $8,000 in rebates from 1 program. 6 licensed installers based in Ashland.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($8,000), a typical job could cost you as little as $0.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
$8,000 per Level 2 charging port and $80,000 per DC fast charging port, or up to 80-95% of eligible project costs, whichever is lower
Loading map…
31 public charging stations in Ashland: 74 Level 2 ports and 29 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Ashland, OR - Tesla Supercharger | 580 Clover Ln | 24 fast | Tesla | 24 hours daily. NACS partner enabled. |
| Shell Gas Station - Ashland | 2373 Ashland St | 1 fast, 1 Level 2 | EVCS | |
| BUTLER AUTO ACURA SALES PDI | 1977 Oregon 99 | 1 fast | ChargePoint Network | 24 hours daily |
| BUTLER AUTO FORD L3 | 1977 Oregon 99 | 1 fast | ChargePoint Network | 24 hours daily |
| BUTLER AUTO FORD SALES LOT | 1977 Oregon 99 | 1 fast | ChargePoint Network | 24 hours daily |
| TC Chevrolet | 2045 OR-99 | 1 fast | Non-Networked | 24 hours daily |
| City of Ashland - Public Parking Lot | 165 Lithia Way | 10 Level 2 | Non-Networked | 24 hours daily |
| Ashland Hills Hotel | 2525 Ashland Avenue | 8 Level 2 | Blink Network | 24 hours daily |
| Southern Oregon University (SOU) - Waii-Ka Shasta Hall | 1250 Siskiyou Blvd. | 6 Level 2 | OpConnect | 24 hours daily |
| Southern Oregon University - Lot 8 | 481 Stadium St | 6 Level 2 | Non-Networked | 24 hours daily; parking permit required; Drivers must bring their own J1772 cordset for Level 1 charging |
| 30 S 2nd St Chargers | 30 S 2nd St | 4 Level 2 | AMPUP | 24 hours daily |
| City of Ashland - The Grove | 1195 E Main St | 4 Level 2 | Non-Networked | 24 hours daily |
| Plaza Inn & Suites Ashland Creek - Tesla Destination | 98 Central Ave | 4 Level 2 | Tesla Destination | 24 hours daily. Open to Teslas only. |
| 130 California St Chargers | 130 California St | 2 Level 2 | AMPUP | 24 hours daily |
| 892 Clay St Chargers | 892 Clay St | 2 Level 2 | AMPUP | 24 hours daily |
| BUTLER AUTO ACURA FORD QL | 1977 Oregon 99 | 2 Level 2 | ChargePoint Network | 24 hours daily |
| BUTLER AUTO ACURA FORD SVC | 1977 Oregon 99 | 2 Level 2 | ChargePoint Network | 24 hours daily |
| BUTLER AUTO NORTH SHOWROOM | 1977 Oregon 99 | 2 Level 2 | ChargePoint Network | 24 hours daily |
| City of Ashland - Public Parking Garage | 175 Hargadine St | 2 Level 2 | Non-Networked | Garage business hours; pay lot |
| MTA-EVCHARGER-1 MTASHLANDEV1 | NF-200 | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Palm Cottages - Tesla Destination | 1065 Siskiyou Blvd | 2 Level 2 | Tesla Destination | 24 hours daily. Open to Teslas only. |
| RedTail Inn - Tesla Destination | 550 E Main St | 2 Level 2 | Tesla Destination | 24 hours daily. Open to Teslas only. |
| SAFEWAY SIDE | 585 Siskiyou Blvd | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SOU LOT 27 | 1225 Ashland Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SOU SOU LOT 1 EAST | 1554 Webster St | 2 Level 2 | ChargePoint Network | 24 hours daily |
Showing 25 of 31.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.