Up to $8,000 in rebates from 3 programs. 5 licensed installers based in Sutherlin.

What it really costs in Sutherlin

A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($8,000), a typical job could cost you as little as $0.

Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.

EV charger rebates in Sutherlin

Douglas Electric Cooperative Level 2 EV charger rebate

Co-op lists a Level 2 EV charger rebate for homes and businesses, funded partly by Clean Fuels credits. Up to $500 residential (per aggregator).

Check status Douglas Electric Cooperative Not yet confirmed
Up to$500

EV charger installers

Public EV charging in Sutherlin

Loading map…

3 public charging stations in Sutherlin: 3 Level 2 ports and 55 DC fast ports.

StationAddressPortsNetworkHours
Sutherlin, OR - Tesla Supercharger116 Clover Leaf Loop51 fastTesla24 hours daily. NACS partner enabled.
Sutherlin Dairy Queen (Sutherlin, OR)1621 W Central Ave4 fastElectrify America24 hours daily
Best Western Plus Hartford Lodge - Tesla Destination150 Myrtle St3 Level 2Tesla Destination24 hours daily. Open to Teslas only.

Source: U.S. Department of Energy station locator. Confirmation dates vary by station.