ODOT Community Charging Rebates (Round 5) - multifamily Level 2 charging
$8,000 per Level 2 charging port and $80,000 per DC fast charging port, or up to 80-95% of eligible project costs, whichever is lower
Up to $8,000 in rebates from 1 program. 6 licensed installers based in The Dalles.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($8,000), a typical job could cost you as little as $0.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
$8,000 per Level 2 charging port and $80,000 per DC fast charging port, or up to 80-95% of eligible project costs, whichever is lower
Loading map…
7 public charging stations in The Dalles: 9 Level 2 ports and 12 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| The Dalles, OR | 1400 West 6th Street | 6 fast | RIVIAN_ADVENTURE | 24 hours daily |
| The Dalles, OR - Tesla Supercharger | 2114 West 6th Street | 5 fast | Tesla | 24 hours daily. Open to Teslas only. |
| Fred Meyer- The Dalles | 1215 W 6th St | 1 fast, 1 Level 2 | EVCS | |
| CG WEST CUSTOMER CHARGE | 1900 W 6th St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Holiday Inn Express & Suites The Dalles Oregon - Tesla Destination | 2920 West 6th St | 2 Level 2 | Tesla Destination | 24 hours daily. Open to Teslas only. |
| Northern Wasco County People's Utility District | 2345 River Rd | 2 Level 2 | Non-Networked | 24 hours daily |
| PARK PARK STATION | E 1st Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.