Oncor Take A Load Off Texas - Home Energy Efficiency Standard Offer Program (heat pumps)
Contractor-paid incentive based on verified kW/kWh savings (rate table not public to customers); passed through as a discount on the installer's invoice
Coppell gets its power from Oncor Electric Delivery (TDU). Here's what you can claim and who can do the work.
Contractor-paid incentive based on verified kW/kWh savings (rate table not public to customers); passed through as a discount on the installer's invoice
Loading map…
Coppell has 1.0 public charging ports per 10,000 residents, against 4.2 across Texas. See how towns compare.
2 public charging stations in Coppell: 10 Level 2 ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| 9000 Cypress Waters Blvd | 9000 Cypress Waters Blvd | 6 Level 2 | LOOP | 24 hours daily |
| Aloft Dallas DFW Airport Grapevine - Tesla Destination | 1155 Northpoint Dr | 4 Level 2 | Tesla Destination | 24 hours daily. Open to all vehicles. |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.