Oncor Take A Load Off Texas - Home Energy Efficiency Standard Offer Program (heat pumps)
Contractor-paid incentive based on verified kW/kWh savings (rate table not public to customers); passed through as a discount on the installer's invoice
Euless gets its power from Oncor Electric Delivery (TDU). Here's what you can claim and who can do the work.
Contractor-paid incentive based on verified kW/kWh savings (rate table not public to customers); passed through as a discount on the installer's invoice
Loading map…
Euless has 10.5 public charging ports per 10,000 residents, against 4.2 across Texas. See how towns compare.
13 public charging stations in Euless: 19 Level 2 ports and 36 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Euless, TX - Tesla Supercharger | 3050 TX-360 | 12 fast | Tesla | 24 hours daily. NACS partner enabled. |
| 1201 Airport Fwy | 1201 Airport Fwy | 8 fast | HYPERFUEL | 24 hours daily; APP |
| 3011 TX-360 | 3011 TX-360 | 8 fast | HYPERFUEL | 24 hours daily |
| Euless, TX Rechargery Relay @ Circle K - E Harwood Rd | 1000 E Harwood Rd | 4 fast | IONNA | 24 hours daily |
| Gateway of Euless | 3050 Highway 360 | 4 fast | eVgo Network | 24 hours daily |
| Arbors of Euless | 1002 Fuller Wiser Rd | 6 Level 2 | LOOP | 24 hours daily |
| DFW AIRPORT DFW 1 | 2400 Aviation Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| DFW AIRPORT DFW 2 | 2400 Aviation Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| DFW AIRPORT DFW 3 | 2400 Aviation Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| DFW AIRPORT DFW IOC EV1 | 3550 S 20th Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
Showing 10 of 13.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.