EV charger installers in Port Arthur, TX

7 licensed installers based in Port Arthur.

What it really costs in Port Arthur

A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.

Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.

EV charger rebates in Port Arthur

We haven't found a program specific to this area yet. Statewide programs are on the state page.

EV charger installers

Arc Electrical Specialists LLC

Port Arthur, 77640
30
Home batteryEV chargerStandby generator
Electrical Contractor 28276

Coastal Industrial Services INC

Port Arthur, 77640
30
Home batteryEV chargerStandby generator
Electrical Contractor 30747

Lobu Electric

Port Arthur, 77642
30
Home batteryEV chargerStandby generator
Electrical Contractor 33503

Loya Electric

Port Arthur, 77642
30
Home batteryEV chargerStandby generator
Electrical Contractor 26617

Mark-1 Electric

Port Arthur, 77642
30
Home batteryEV chargerStandby generator
Electrical Contractor 26805

Platinum Electrical Services

Port Arthur, 77642
30
Home batteryEV chargerStandby generator
Electrical Contractor 22008

Three Amigos Electrical Solutions

Port Arthur, 77640
30
Home batteryEV chargerStandby generator
Electrical Contractor 40527

Public EV charging in Port Arthur

Loading map…

1 public charging station in Port Arthur: 1 Level 2 port.

StationAddressPortsNetworkHours
Twin City Nissan10549 Highway 691 Level 2Non-NetworkedDealership business hours

Source: U.S. Department of Energy station locator. Confirmation dates vary by station.