GVEC heat pump AC/heating system rebate
$650 per unit
Seguin gets its power from City of Seguin Electric and Guadalupe Valley Electric Cooperative (GVEC). Here's what you can claim and who can do the work.
$650 per unit
For residential installations, the lesser option of $600 or 50% of total installation costs
Upfront: Tesla Powerwall $515/kW for the first unit installed on or after Apr 1, 2026 and $220/kW for each additional; Enphase IQ Battery $220/kW (installed on or after Jul 1, 2024); capped at 23 kW. Ongoing: $75/kW...
Loading map…
Seguin has 2.3 public charging ports per 10,000 residents, against 4.2 across Texas. See how towns compare.
6 public charging stations in Seguin: 0 Level 2 ports and 12 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| La Quinta Inn (Seguin, TX) | 1501 N State Highway 46 | 4 fast | Electrify America | 24 hours daily |
| Seguin, TX Rechargery Relay @ Circle K - W Ih 10 | 1805 W Ih 10 | 4 fast | IONNA | 24 hours daily |
| GVEC DC 1 | 927 TX-46 | 1 fast | ChargePoint Network | 24 hours daily |
| GVEC DC 2 | 6400 I-10 | 1 fast | ChargePoint Network | 24 hours daily |
| HALFTIME 3 STATION 1 | 101 Meadow Lake Drive | 1 fast | ChargePoint Network | 24 hours daily |
| HALFTIME 3 STATION 2 | 101 Meadow Lake Drive | 1 fast | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.