EV charger installers in Ashland, VA
34 licensed installers based in Ashland.
What it really costs in Ashland
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in Ashland
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
Cornerstone Electrical INC
Ashland, 23005Cr Phillips Electrical Contractors INC
Ashland, 23005Hazelwood Electrical & General Services LLC
Ashland, 23005Miller-hancock Services Corporation
Ashland, 23005Shockoe Solar LLC
Ashland, 23005Smartwire LLC
Ashland, 23005Hazzard Electrical LLC
Ashland, 23005Nexus Energy Systems LLC
Ashland, 23005Advanced Fueling Systems
Ashland, 23005Amat INC
Ashland, 23005Cb Critical Systems LLC
Ashland, 23005Show all 34 installers
- D & D Electric INC
- D & D Services Of Va INC
- Dallas Electrical Co INC
- Excel Electric LLC
- Goshen Electric INC
- H O Feild Electric Co INC
- Lanier Construction INC
- M E Keeton Electrical Contractor INC
- Pole Green Services INC
- Power & Flow Solutions LLC
- R W Peak Construction And Remodeling LLC
- Robert E Peatross
- S W Mills Electrical INC
- Singlepoint Technologies Corporation
- Tri-star Construction LLC
- William Jerome Cox Jr
- Joshua Chandler Bauserman
- F.h Furr Plumbing Heating Air Conditioning & Electrical LLC (703) 997-2894
- Southern Exposure Solar LLC
- Benco Builders LLC
- Ashland Ventures LLC
- Haven Electrical LLC
Public EV charging in Ashland
Loading map…
16 public charging stations in Ashland: 32 Level 2 ports and 36 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| TA Lewistown Road, Ashland, VA | 10134 Lewistown Road | 12 fast | BP_PULSE | 24 hours daily |
| Ashland, VA - Tesla Supercharger | 12341 Washington Highway Washington Highway | 8 fast | Tesla | 24 hours daily. NACS partner enabled. |
| Ashland, VA Rechargery @ Wawa - N Washington Hwy | 100 N Washington Hwy | 8 fast | IONNA | 24 hours daily |
| 703 England | 703 England St | 4 fast | EV Connect | 24 hours daily |
| Sheehy Ford of Ashland - DCFC | 11450 Washington Highway | 2 fast | Blink Network | 24 hours daily |
| WHITTEN ASHLAND POWER LINK 1 | 11409 Washington Highway | 2 fast | ChargePoint Network | 24 hours daily |
| Sheehy Ford of Ashland | 11450 Washington Highway | 6 Level 2 | Blink Network | 24 hours daily |
| Ashland Town Hall | 121 Thompson St | 4 Level 2 | Non-Networked | 24 hours daily |
| Pamunkey Regional Library | 201 S Railroad Ave | 4 Level 2 | Non-Networked | 24 hours daily |
| Sonny Merryman Greater Richmond | 11228 Hopson Rd | 4 Level 2 | Non-Networked | 24 hours daily; for employee use only |
| Town Hall & Downtown Parking | 101 Thompson St | 4 Level 2 | Non-Networked | 24 hours daily |
| Town of Ashland | 109 Hanover Rd | 4 Level 2 | Non-Networked | 24 hours daily |
| Richmond Electricians' Joint Apprenticeship and Training Center | 11255 Air Park Rd | 2 Level 2 | Non-Networked | 24 hours daily |
| Sheehy Ford | 11450 Washington Hwy | 2 Level 2 | Non-Networked | For dealership use only |
| General RV Center | 12500 Harley Club Dr | 1 Level 2 | Non-Networked | 24 hours daily; for customer use only |
| Randolph-Macon College - Andrews Hall | 420 Henry St | 1 Level 2 | Non-Networked | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.