Snohomish County PUD ducted heat pump instant rebates
$1,800 for a ducted conversion heat pump (min 7.5 HSPF2 / 13.8 SEER2); $2,500 for a ducted inverter-driven heat pump (min 8.5 HSPF2 / 13.8 SEER2)
Arlington gets its power from Snohomish County PUD. Here's what you can claim and who can do the work.
$1,800 for a ducted conversion heat pump (min 7.5 HSPF2 / 13.8 SEER2); $2,500 for a ducted inverter-driven heat pump (min 8.5 HSPF2 / 13.8 SEER2)
Up to $1,000 (cannot exceed purchase price)
Amounts are set by each local administrator and vary by equipment and work. Covers heat pumps (ducted, ductless, PTHP, ground-source), heat pump water heaters, heat pump dryers and related panel/wiring upgrades. Some...
No per-household dollar amount is published.
Loading map…
Arlington has 18.7 public charging ports per 10,000 residents, against 11.4 across Washington. See how towns compare.
20 public charging stations in Arlington: 25 Level 2 ports and 42 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Arlington, WA - Tesla Supercharger | 3438 Stoluckquamish Lane | 16 fast | Tesla | 24 hours daily. Open to Teslas only. |
| Electric Era Charging Station | 2216 WA-530 | 8 fast | ELECTRIC_ERA | 24 hours daily |
| Walmart EV Charging | 4010 172nd St NE | 8 fast | WALMART | 24 hours daily |
| Electric Era Charging Station | 3438 Stoluckquamish Ln | 6 fast | ELECTRIC_ERA | 24 hours daily |
| Pilot Travel Center 1103 | 2430 State Route 530 NE | 4 fast | eVgo Network | 24 hours daily |
| COA - AP AIRPORT EV | 238 N Olympic Ave | 2 Level 2 | ChargePoint Network | 24 hours daily |
| PARK77 PARK77 LEASING | 20227 77th Ave NE | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SNOPUD POWERED MUARL3101#1 | 17601 59th Ave NE | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SNOPUD POWERED MUARL3101#2 | 17601 59th Ave NE | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SNOPUD POWERED MUARL3101#3 | 17601 59th Avenue Northeast | 2 Level 2 | ChargePoint Network | 24 hours daily |
Showing 10 of 20.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.