PG&E Residential EV Charging rebate (Rebate Plus, income-qualified)
Up to $2,000 for installation of an eligible EV charger; Up to $5,000 for a panel upgrade and installation of an eligible EV charger
Hollister gets its power from Pacific Gas and Electric Company (PG&E) and Central Coast Community Energy (3CE). Here's what you can claim and who can do the work.
Up to $2,000 for installation of an eligible EV charger; Up to $5,000 for a panel upgrade and installation of an eligible EV charger
Per the September 2025 relaunch, rebates of $150 to $3,000 per measure, with higher amounts for CARE/FERA customers. Covers heat pump water heaters, heat pump HVAC and portable heat pumps. The 2026-27 per-unit...
Up to $2,000 toward buying and installing a Level 2 home charger. The alternative is a $2,000 prepaid card for public charging; you get one or the other. It comes with a DCAP vehicle grant: up to $7,500 with no...
Instant rebate of $400-$700 for replacing a natural gas storage water heater with a qualifying heat pump water heater. The amount depends on the type and size of the unit replaced (per Marin County page updated...
Up to $300 per qualified customer account; CARE or FERA customers may receive up to an additional $200 (up to $500 total)
No cost to the household. Every home served gets a heat pump for heating and cooling, a heat pump water heater, or both. Some homes also get induction cooking, laundry, building envelope and electrical remediation...
Pays battery owners, through their aggregator (storage VPP provider), for exporting during grid-stress events. The 2026 per-kW rate was not confirmed. The total budget is $109.5M, with about $34M left after projected...
No cost to the household. Eligible homes can get a heat pump water heater replacement installed free (SCE and PG&E pages), along with other efficiency upgrades. No dollar amount per household is published.
$3/watt incentives to install an onsite solar system; Program budget: $120 million total ($10 million per year 2019 - 2030)
A free permanent backup battery system, installed at no cost. More than 3,800 customers have received one since 2022. PG&E says free batteries are almost gone for 2026.
Residential charger and installation rebate with income tiers: Tier 1 at 201%-400% FPL, Tier 2 under 200% FPL. The 2026 program added $500 for a bidirectional charger. Base amounts were not found, and the program...
Multifamily – Low-to-Moderate Income (LMI): Heat Pump for Space Heating and Cooling – Variable Speed (Heat Pump HVAC) $8,000; In-Unit Heat Pump Water Heater $1,750; Electric Load Service Center (Electric Panel)...
up to $8,000 for low-income households and $4,000 for moderate-income households for a heat pump HVAC unit
FULLY RESERVED since 2025-11-14, with no new reservations. The last amounts, per an SCE fact sheet: $1,000 for a heat pump water heater replacing an electric resistance unit, or up to $3,100 replacing a gas water...
Storage: 1,100/kWh; Solar: 3,100/kW
The rebate may cover 80 percent to 100 percent of the cost of installing a battery storage system.
CLOSED: these ratepayer budgets stopped taking new applications, including waitlist entries, after 2025-12-30. The Equity budget rate was $0.85/Wh. The final general-market step rate was not confirmed.
free backup power transfer meter
Applications for 2026 are closed. The Portable Battery Program has reached capacity for 2026. The program is no longer accepting new applications.
CLOSED to new applications since 2026-03-19. 3CE planned a virtual power plant pilot for fall 2026.
Loading map…
Hollister has 10.2 public charging ports per 10,000 residents, against 17.5 across California. See how towns compare.
15 public charging stations in Hollister: 16 Level 2 ports and 56 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Hollister, CA - Airline Hwy - Tesla Supercharger | 1700 Airline Hwy | 20 fast | Tesla | 24 hours daily. NACS partner enabled. |
| Hollister, CA - Tesla Supercharger | 10021 Pacheco Pass Hwy | 20 fast | Tesla | 24 hours daily. Open to Teslas only. |
| Hollister Shopping Center | 341 Tres Pinos Rd. | 10 fast | eVgo Network | 24 hours daily |
| Ridgemark Gold Club & Resort | 3800 Airline Hwy | 2 fast | NOODOE | |
| US Bank Hollister | 300 Tres Pinos Rd | 2 fast | EVCS | |
| DC CORRIDOR TARGET H DC2 | 1790 Airline HWY | 1 fast | ChargePoint Network | 24 hours daily |
| DC CORRIDOR TARGET H DC3 | 1790 Airline HWY | 1 fast | ChargePoint Network | 24 hours daily |
| Holiday Inn Express & Suites Hollister | 391 Gateway Dr | 5 Level 2 | EVCS | |
| HOLLISTER-PW COH STATION 1 | 300 West St Hollister | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SJO COMM. PARK SJO COMM. PARK | 0 San Juan Oaks Drive | 2 Level 2 | ChargePoint Network | 24 hours daily |
Showing 10 of 15.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.