PG&E Residential EV Charging rebate (Rebate Plus, income-qualified)
Up to $2,000 for installation of an eligible EV charger; Up to $5,000 for a panel upgrade and installation of an eligible EV charger
Mill Valley gets its power from Pacific Gas and Electric Company (PG&E) and MCE (Marin Clean Energy). Here's what you can claim and who can do the work.
Up to $2,000 for installation of an eligible EV charger; Up to $5,000 for a panel upgrade and installation of an eligible EV charger
Up to $2,000 toward buying and installing a Level 2 home charger. The alternative is a $2,000 prepaid card for public charging; you get one or the other. It comes with a DCAP vehicle grant: up to $7,500 with no...
Instant rebate of $400-$700 for replacing a natural gas storage water heater with a qualifying heat pump water heater. The amount depends on the type and size of the unit replaced (per Marin County page updated...
Rebate of up to $675 for installing a heat pump water heater
Up to $300 per qualified customer account; CARE or FERA customers may receive up to an additional $200 (up to $500 total)
$50 one-time bonus for enrolling and charging, plus $10 per month for charging during low-carbon events
No cost to the household. Every home served gets a heat pump for heating and cooling, a heat pump water heater, or both. Some homes also get induction cooking, laundry, building envelope and electrical remediation...
Pays battery owners, through their aggregator (storage VPP provider), for exporting during grid-stress events. The 2026 per-kW rate was not confirmed. The total budget is $109.5M, with about $34M left after projected...
No cost to the household. Eligible homes can get a heat pump water heater replacement installed free (SCE and PG&E pages), along with other efficiency upgrades. No dollar amount per household is published.
$3/watt incentives to install an onsite solar system; Program budget: $120 million total ($10 million per year 2019 - 2030)
A free permanent backup battery system, installed at no cost. More than 3,800 customers have received one since 2022. PG&E says free batteries are almost gone for 2026.
Rebate of up to $400 per 500 square feet for installing a heat pump heating and cooling system
Multifamily – Low-to-Moderate Income (LMI): Heat Pump for Space Heating and Cooling – Variable Speed (Heat Pump HVAC) $8,000; In-Unit Heat Pump Water Heater $1,750; Electric Load Service Center (Electric Panel)...
up to $8,000 for low-income households and $4,000 for moderate-income households for a heat pump HVAC unit
FULLY RESERVED since 2025-11-14, with no new reservations. The last amounts, per an SCE fact sheet: $1,000 for a heat pump water heater replacing an electric resistance unit, or up to $3,100 replacing a gas water...
Storage: 1,100/kWh; Solar: 3,100/kW
The rebate may cover 80 percent to 100 percent of the cost of installing a battery storage system.
CLOSED: these ratepayer budgets stopped taking new applications, including waitlist entries, after 2025-12-30. The Equity budget rate was $0.85/Wh. The final general-market step rate was not confirmed.
free backup power transfer meter
Applications for 2026 are closed. The Portable Battery Program has reached capacity for 2026. The program is no longer accepting new applications.
Loading map…
Mill Valley has 12.2 public charging ports per 10,000 residents, against 17.5 across California. See how towns compare.
10 public charging stations in Mill Valley: 13 Level 2 ports and 18 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Mill Valley, CA - Tesla Supercharger | 800 Strawberry Village | 12 fast | Tesla | 24 hours daily. NACS partner enabled. |
| Safeway 0788 (Mill Valley, CA) | 1 Camino Alto | 3 fast, 1 Level 2 | Electrify America | 24 hours daily |
| Whole Foods Mill Valley - E Blithedale | 731 E Blithedale Ave | 3 fast | eVgo Network | 24 hours daily |
| HAUKE PARK HAUKE PARK 1 | 1 Hamilton Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| PWRO: GOGA Public Electric Vehicle Chargers - 2.C | Muir Woods Plaza Parking Lot | 2 Level 2 | Non-Networked | Contact station for availability |
| TUHSD THSEV1+2 | 700 Miller Avenue | 2 Level 2 | ChargePoint Network | 24 hours daily |
| TUHSD THSEV3+4 | 700 Miller Avenue | 2 Level 2 | ChargePoint Network | 24 hours daily |
| TUHSD THSEV5+6 | 700 Miller Avenue | 2 Level 2 | ChargePoint Network | 24 hours daily |
| TUHSD THSEV7 | 700 Miller Avenue | 1 Level 2 | ChargePoint Network | 24 hours daily |
| TUHSD THSEV8 | 700 Miller Avenue | 1 Level 2 | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.