PG&E Residential EV Charging rebate (Rebate Plus, income-qualified)
Up to $2,000 for installation of an eligible EV charger; Up to $5,000 for a panel upgrade and installation of an eligible EV charger
San Carlos gets its power from Pacific Gas and Electric Company (PG&E) and Peninsula Clean Energy (WestLight Energy). Here's what you can claim and who can do the work.
Up to $2,000 for installation of an eligible EV charger; Up to $5,000 for a panel upgrade and installation of an eligible EV charger
$3,500 for replacing a gas water heater; $500 for replacing an electric resistance unit (terms updated 2026-05-18). Bonus rebates with a HPWH or heat pump HVAC: $1,000 panel upgrade, $500 smart circuit controller,...
Up to $2,000 toward buying and installing a Level 2 home charger. The alternative is a $2,000 prepaid card for public charging; you get one or the other. It comes with a DCAP vehicle grant: up to $7,500 with no...
$1,500 for a heat pump replacing a gas heater or furnace (terms 2026-05-18; an older page shows $2,500). The same panel, smart circuit controller and CARE/FERA bonus rebates apply.
Instant rebate of $400-$700 for replacing a natural gas storage water heater with a qualifying heat pump water heater. The amount depends on the type and size of the unit replaced (per Marin County page updated...
Up to $300 per qualified customer account; CARE or FERA customers may receive up to an additional $200 (up to $500 total)
No cost to the household. Every home served gets a heat pump for heating and cooling, a heat pump water heater, or both. Some homes also get induction cooking, laundry, building envelope and electrical remediation...
Pays battery owners, through their aggregator (storage VPP provider), for exporting during grid-stress events. The 2026 per-kW rate was not confirmed. The total budget is $109.5M, with about $34M left after projected...
No cost to the household. Eligible homes can get a heat pump water heater replacement installed free (SCE and PG&E pages), along with other efficiency upgrades. No dollar amount per household is published.
$3/watt incentives to install an onsite solar system; Program budget: $120 million total ($10 million per year 2019 - 2030)
A free permanent backup battery system, installed at no cost. More than 3,800 customers have received one since 2022. PG&E says free batteries are almost gone for 2026.
Multifamily – Low-to-Moderate Income (LMI): Heat Pump for Space Heating and Cooling – Variable Speed (Heat Pump HVAC) $8,000; In-Unit Heat Pump Water Heater $1,750; Electric Load Service Center (Electric Panel)...
up to $8,000 for low-income households and $4,000 for moderate-income households for a heat pump HVAC unit
FULLY RESERVED since 2025-11-14, with no new reservations. The last amounts, per an SCE fact sheet: $1,000 for a heat pump water heater replacing an electric resistance unit, or up to $3,100 replacing a gas water...
Storage: 1,100/kWh; Solar: 3,100/kW
The rebate may cover 80 percent to 100 percent of the cost of installing a battery storage system.
CLOSED: these ratepayer budgets stopped taking new applications, including waitlist entries, after 2025-12-30. The Equity budget rate was $0.85/Wh. The final general-market step rate was not confirmed.
free backup power transfer meter
Applications for 2026 are closed. The Portable Battery Program has reached capacity for 2026. The program is no longer accepting new applications.
State rebates that could be able to cover 100% of project costs
Loading map…
San Carlos has 22.8 public charging ports per 10,000 residents, against 17.5 across California. See how towns compare.
22 public charging stations in San Carlos: 38 Level 2 ports and 29 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| San Carlos, CA - Tesla Supercharger | 1127 Industrial Road | 19 fast | Tesla | 24 hours daily. Open to Teslas only. |
| Home Depot -0628-San Carlos | 1125 OLD COUNTY RD | 8 fast | eVgo Network | 24 hours daily |
| San Carlos Library | 610 Elm St | 2 fast, 1 Level 2 | eVgo Network | 24 hours daily |
| Hyatt Place San Carlos - Tesla Destination | 26 El Camino Real | 7 Level 2 | Tesla Destination | Mon-Fri: 10:00am-9:00pm; Sat-Sun: 11:00am-9:00pm. Open to all vehicles. |
| GENESIS SKYWAY 959 SKYWAY 01 | 959 Skyway Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| GENESIS SKYWAY 959 SKYWAY 02 | 959 Skyway Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| GENESIS SKYWAY 959 SKYWAY 03 | 959 Skyway Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| GENESIS SKYWAY 959 SKYWAY 04 | 959 Skyway Road | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SAN CARLOS STATION 3 | 657 walnut street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| SAN CARLOS WHEELER DUAL | 657 Walnut St | 2 Level 2 | ChargePoint Network | 24 hours daily |
Showing 10 of 22.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.