Energize CT Residential Ground Source Heat Pump rebate
$1,500 per ton up to $15,000 for qualifying ground source heat pumps
North Branford gets its power from United Illuminating (UI) and Wallingford Electric Division. Here's what you can claim and who can do the work.
$1,500 per ton up to $15,000 for qualifying ground source heat pumps
$1,500 per ton for installs on or after Sept 1, 2026 (was $1,000/ton Jan 1-Aug 31, 2026), up to $10,000 per home; enhanced incentives for electric-baseboard replacement
$250/ton up to $2,500 combined incentives
$900 instant discount or $900 rebate; enhanced $1,000 incentive (up to $1,900 total)
up to $1,500
Up to $750 (or 100% of installed cost, whichever is less)
$100 one-time enrollment incentive; ongoing up to $120/year (Baseline tier) or up to $300/year (Advanced tier)
$40 co-pay (effective April 1, 2026) for assessment plus no-cost air sealing (up to 7 hours)
No-cost energy assessment and qualifying installations at little or no cost
Enrollment incentive $30/kWh (standard) or $130/kWh (grid-edge circuits); plus performance payments of $300/kW (standard), $450/kW (underserved) or $550/kW (low-income) paid over 10 years based on average kW...
Financing, not a rebate: 1.99% interest, 5-year term, up to $25,000 at the special rate (larger loans up to $50,000 at a blended rate); no prepayment penalty
2026 enrollees: Buy-All $0.3289/kWh (incl. REC value) locked for 20 years, or Netting at retail-rate credits with $0 REC payment and a $0.0402/kWh charge on total production; households at or below 60% SMI get...
Amount not confirmed - contact WED (203-294-2280) for the current schedule
Loading map…
North Branford has 0.7 public charging ports per 10,000 residents, against 13.6 across Connecticut. See how towns compare.
1 public charging station in North Branford: 1 Level 2 port.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Van Wilgen's Garden Center | 51 Valley Rd | 1 Level 2 | Non-Networked | 9am-5pm M-F |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.