Energize CT Residential Ground Source Heat Pump rebate
$1,500 per ton up to $15,000 for qualifying ground source heat pumps
Westport gets its power from Eversource (CT). Here's what you can claim and who can do the work.
$1,500 per ton up to $15,000 for qualifying ground source heat pumps
$1,500 per ton for installs on or after Sept 1, 2026 (was $1,000/ton Jan 1-Aug 31, 2026), up to $10,000 per home; enhanced incentives for electric-baseboard replacement
$250/ton up to $2,500 combined incentives
$900 instant discount or $900 rebate; enhanced $1,000 incentive (up to $1,900 total)
up to $1,500
$100 one-time enrollment incentive; ongoing up to $120/year (Baseline tier) or up to $300/year (Advanced tier)
$40 co-pay (effective April 1, 2026) for assessment plus no-cost air sealing (up to 7 hours)
No-cost energy assessment and qualifying installations at little or no cost
Enrollment incentive $30/kWh (standard) or $130/kWh (grid-edge circuits); plus performance payments of $300/kW (standard), $450/kW (underserved) or $550/kW (low-income) paid over 10 years based on average kW...
Financing, not a rebate: 1.99% interest, 5-year term, up to $25,000 at the special rate (larger loans up to $50,000 at a blended rate); no prepayment penalty
2026 enrollees: Buy-All $0.3289/kWh (incl. REC value) locked for 20 years, or Netting at retail-rate credits with $0 REC payment and a $0.0402/kWh charge on total production; households at or below 60% SMI get...
Loading map…
Westport has 17.5 public charging ports per 10,000 residents, against 13.6 across Connecticut. See how towns compare.
14 public charging stations in Westport: 49 Level 2 ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Baldwin Parking Lot | 35 Elm Street | 12 Level 2 | EV Connect | 24 hours daily |
| Saugatuck Station – Lot 1 | Park Street | 7 Level 2 | Blink Network | 24 hours daily |
| 1st Floor Parking | 85 Post Road West | 5 Level 2 | EVOKE | |
| Lower Level Parking | 85 Post Road West | 4 Level 2 | EVOKE | |
| Saugatuck Railroad Station Lot #3 | 1 Ferry Ln | 4 Level 2 | EV Connect | 24 hours daily |
| Fire HQ | 515 Post Rd East | 2 Level 2 | EV Connect | 24 hours daily |
| GFA STATION NORTH | 35 Beachside Ave | 2 Level 2 | ChargePoint Network | Mon: 6:30am-3:30pm; Tue: 6:30am-3:30pm; Wed: 6:30am-3:30pm; Thu: 6:30am-3:30pm; Fri: 6:30am-3:30pm |
| GFA STATION SOUTH | 35 Beachside Ave | 2 Level 2 | ChargePoint Network | Mon: 6:30am-3:30pm; Tue: 6:30am-3:30pm; Wed: 6:30am-3:30pm; Thu: 6:30am-3:30pm; Fri: 6:30am-3:30pm |
| Greens Farms Railroad Station Lot #1 | New Creek Rd | 2 Level 2 | Blink Network | 24 hours daily |
| National Hall | 2 Post Rd W | 2 Level 2 | AMPUP | Contact station for hours of availability. |
Showing 10 of 14.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.