EV charger installers in Willamina, OR

Up to $8,000 in rebates from 3 programs. 0 licensed installers based in Willamina.

What it really costs in Willamina

A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($8,000), a typical job could cost you as little as $0.

Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.

EV charger rebates in Willamina

PGE home EV charger and panel upgrade rebates (Smart Charging)

Up to $6,000 in rebates on qualifying level 2 home EV chargers and installation costs; Charger Installation Rebate up to $300 or up to $1,000 if income eligible; Electrical Service Upgrade Rebate up to $1,000 or up...

Check status Portland General Electric Checked 2026-10-11
Up to$6,000

PGE Smart Charging rewards

Up to $50 per year in rewards ($25 seasonal reward); $50 rebate for Tesla owners or chargers bought before being added to the qualified products list

Open Portland General Electric Checked 2026-10-11
Up to$50

EV charger installers

No licensed installer is based here yet. Ask for quotes and we'll match you with installers from nearby towns.

Public EV charging in Willamina

Loading map…

4 public charging stations in Willamina: 4 Level 2 ports.

StationAddressPortsNetworkHours
139 SE Baker St, Willamina139 SE Baker St1 Level 2OpConnect24 hours daily
155 SE Baker St, Willamina155 SE Baker St1 Level 2OpConnect24 hours daily
385 NE C St, Willamina385 NE C St1 Level 2OpConnect24 hours daily
547 NW B St, Willamina547 NW B St1 Level 2OpConnect24 hours daily

Source: U.S. Department of Energy station locator. Confirmation dates vary by station.